batshonnicole
batshonnicole batshonnicole
  • 02-01-2019
  • Mathematics
contestada

Six people paint the fence and 15 hours how long would it take five workers to do the same job

Respuesta :

somaiasult2006
somaiasult2006 somaiasult2006
  • 02-01-2019
it will take 12.5 hrs for five workers to do the same job.


steps:

15 × 5 = 75

75 ÷ 6 = 12.5
Answer Link

Otras preguntas

Which of the following describes a role of gravity in the formation of our solar system? I. In the early stages of solar system formation, a fragment of an int
When you stub your toe, the information is sent to the brain using:?
which of the following planets most likely has the coldest surface temperature
If you help ill give you brainliest!!! Find the missing leg of a right triangle with one leg = 4 inches and the hypotenuse = 5 inches. h 3 a=4, b= ? , c = 5, s
What is the expression for the calculation double the product of 8 and 3
National party organizations can dictate the day-to-day decisions of
What often results in a woodland without frequent fires? A.A predominance of pine trees B.A predominance of fast-growing trees C.Barren land D.An understory
how to convert 24cm to L
Select all possible numbers that when replaced with the "?" in the set of ordered pairs {(3, 4), (–2, –5), (?, 0)} would create a function. A. –5 B.–2 C. 0
PLEASE HELP Three times the number of blue marbles exceeds twice the number of red marbles by 18 also five times the number of blue marbles is two less than si