Ibbythe8356 Ibbythe8356
  • 04-05-2019
  • Social Studies
contestada

When planning your week the first thing to consider about each activity that your scheduling is its priority level?

Respuesta :

RyleeCanaan12 RyleeCanaan12
  • 04-05-2019

Answer:

yes

Explanation:

i think that if you are going to get things done, than you need to think about how important they are. if something is needed in two weeks, you can save that for later. if something is needed in two or three days, i would do that first. different people have different ways of planning, but that is my opinion

Answer Link

Otras preguntas

Escoge la conjugación correcta del verbo Yo _______ en cuenta mis intereses.
*WILL MARK BRAINIEST* 1. What is the length of the side of the brick labeled a? 2. What is the length of the side of the brick labeled b? 3. What is the total h
Martin has data in cell E14 and the cell should be blank . He should
What can be inferred about the Philippines?It is doing well but is still a poor nation compared with others.It has enjoyed sporadic economic success since the 1
What is six times six
I need help what’s the answer plz
Which of the following represents the initial reason why NATO was formed? (5 points) To provide for the mutual defense of any member nation against an attack by
(07.06 LC) If n is at least 7, which inequality best represents the values of n? (1 point) n ≥ 7 n ≤ 7 n < 7 n > 7
(!!15 points!!) Find the measure of arc BDC
Evaluate the expression: 1/3 (4x3) + 2^3