katriceervin12p8wls8 katriceervin12p8wls8
  • 02-05-2020
  • Mathematics
contestada

If it takes 12 weeks for the factory to be at full capacity, how many weeks would it take for the factory to be at half capacity?

Respuesta :

jam2282
jam2282 jam2282
  • 02-05-2020

Answer:

it takes 6 weeks fir the factory to be at half capacity

Step-by-step explanation:

half of 12 is 6

Answer Link
jojiwalt
jojiwalt jojiwalt
  • 02-05-2020

It would take 6 weeks to be at half capacity

Answer Link

Otras preguntas

21/24÷7/8 show work please
10 gallons divided by 17 people
What value of the variable makes the statement true? m + 4 = –2.8 a. –6.8 b. –1.2 c. 1.2 d. 6.8
An ion in a mass spectrometer follows a semicircular path of radius 14.8. What is the distance it travels?
Solve for x. 2x^2+12x+11-(x+4)^2
what are particles of carbon that enter the air when wood or coal are burned?
The FIRST president of Russia elected directly by the people in relatively free elections was?
Which best describes the process that the pest population has experienced due to this environmental change? genetic diversity natural selection natural resistan
How do you solve X+y=11 Xy=30
which expression has a value that is less than the Base of that expresion