raazshah661 raazshah661
  • 03-09-2020
  • Mathematics
contestada

A can do a piece of work in 20 days and B can do it in 12 days,B work for 9 days,in how many days A alone can do the work​

Respuesta :

roseheart889 roseheart889
  • 03-09-2020

Answer: 9

Step-by-step explanation:

Answer Link

Otras preguntas

The audience for a particular piece of writing is school administrators. The purpose of the text is to persuade them to allow an open campus. What type of lang
Where would you place salt production in the product–process spectrum?
A 16 oz package of brown rice cost 79cents and 32oz package of white rice costs $3.49 which package is a better deal
Which action started the war between the United States and Mexico? A. Mexican general Santa Anna ordered his troops to invade some disputed land for Mexico. B.
Rewrite the sentence by varying the beginning. I rode my bike to baseball practice after school.
Over 25.5 days, a pond's water level changed by an average of −0.32 centimeter each day. What was the total change in the water level? A. -10.55 B. -8.16 C. 8
How to factor with a number in front of the first variable?
How do you isolate the variable ‘c’ in the equation F=(9/5)c+32 ?
what is the algebraic expression that describes the monthly salary? Let x be the hours of training.
If you counted 20 colonies from a 0.01 ml inoculum of a 1:10 dilution of urine, how many organisms per milliliter of specimen would you report? is this number s