MaThWiZz6123 MaThWiZz6123
  • 02-07-2021
  • Mathematics
contestada

It take 4 people 40 minutes to clean a garden. How long will it take 6 people to clean the same garden

Respuesta :

loconte loconte
  • 02-07-2021

Answer:

4/9 of an hour (26.666 minutes)

Step-by-step explanation:

4 * x * 40/60 = 1

x * 160/60 = 1

x=60/160 = 6/16 = 3/8 (this is the rate for one worker)

~~~~~~~~~~~~~~~~

6 * (3/8) * x = 1

x = 4/9

Answer Link

Otras preguntas

now write a short journal entry or letter about 200 words from the puint of view
what is two examples of software and hardware?​
Help me please it's do today
Which of the following tables of equivalent ratios is completed correctly? Choose all that apply.
The first step in the scientific method is to A) test with an experiment. B) form a hypothesis. C) draw a conclusion. D) analyze the data.
Drag each tile to the correct location, Categorize the items as products or services. haircut book medical checkup cellular device cellular network connection a
The factors of m^2 - 256 are(m+4)^2(m-4}^2(m+4) (m-4)none of these​
HELLO I AM THE ZODIAC MASTER IF YOU WANT ME TO DO YOUR ZODIAC COMMENT ON THIS QUESTION AND WHICH EVER ZODIAC GETS THE MOST LIKES WILL GET CHOSEN THC FOR YOUR T
HELPPPPPPPPPPPPPPPPPPP
What is the slope of this graph?A. -4B. 1/4C. -1/4D. 4​