bryceisabeast3543 bryceisabeast3543
  • 02-09-2017
  • Business
contestada

Variances are calculated by subtracting the actual cost from ____

Respuesta :

thert68
thert68 thert68
  • 02-09-2017
Budgeted cost is the answer as by having the budget plan to compare to, the business, government agency, or non-profit organization can make adjustments to its management of costs or future budgets. 
Answer Link

Otras preguntas

how can dividing a diverse country into regions make it easier to understand?
Find the perimeter and volume of the shed.
Find the slope of the line that passes through (10,8) and (9,13)
(-t^2+5t^2-6t)+(8t2 – 8t) Answer should be an expanded polynomial in standard form
Write a 1 paragraph summary of what happened in "La Catrina" Episode 7. - DO NOT COPY AND PASTE FROM ANOTHER WEBSITE, PLEASE! - just search "La Catrina" episod
Which economic indicators do economists use to predict business cycle? Can you help me in this question please !!
Nathan drew a right triangle with vertices A(x1, y1), B(x2, y2), and C(x3, y3). AC is the longest side in ΔABC. What must be true for this triangle?
Here are six measurements of the electrical conductivity of an iron rod. 10.06 9.87 10.03 10.14 10.19 10.09 The iron rod is supposed to have conductivity 10.1.
What were the main ideals of the Confederate States of America? Why was Jefferson Davis chosen as its president?
is 3√ a irrational number